Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

Initial plan of shipbuilding capacity based on the stochastic discrete event simulation

Authors
Kim, K.Lee, J.Hwang, H.
Issue Date
2013
Keywords
DEVS (discrete event system); IHOP (integrated hull & outfitting plan); Master production schedule; PPR-S (product; Process; Production capacity; PWBS (product work breakdown structure); Resource; Schedule); Ship production
Citation
Proceedings of the International Offshore and Polar Engineering Conference, pp 713 - 720
Pages
8
Journal Title
Proceedings of the International Offshore and Polar Engineering Conference
Start Page
713
End Page
720
URI
https://www.kriso.re.kr/sciwatch/handle/2021.sw.kriso/8757
ISSN
1098-6189
Abstract
Capacity plan plays an important role for both master production schedule and facility design in shipbuilding. This paper discusses the DEVS for a shipbuilding simulation required by capacity plan. A stochastic shipyard simulation is introduced to evaluate the capability of executing master production schedules in a shipyard as it simulates IHOP and master production schedule. The use of PPR-S model and object oriented DEVS as an integration mechanism for simulation is also discussed. DEVS shows production problems such as capacity shortages and throughput of each resource. Based on the stochastic DEVS model, the production capacity of each facility is evaluated. Copyright ? 2013 by the International Society of Offshore and Polar Engineers (ISOPE).
Files in This Item
There are no files associated with this item.
Appears in
Collections
ETC > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Altmetrics

Total Views & Downloads

BROWSE