Initial plan of shipbuilding capacity based on the stochastic discrete event simulation

Full metadata record
DC Field Value Language
dc.contributor.authorKim, K.-
dc.contributor.authorLee, J.-
dc.contributor.authorHwang, H.-
dc.date.accessioned2023-12-22T09:00:34Z-
dc.date.available2023-12-22T09:00:34Z-
dc.date.issued2013-
dc.identifier.issn1098-6189-
dc.identifier.urihttps://www.kriso.re.kr/sciwatch/handle/2021.sw.kriso/8757-
dc.description.abstractCapacity plan plays an important role for both master production schedule and facility design in shipbuilding. This paper discusses the DEVS for a shipbuilding simulation required by capacity plan. A stochastic shipyard simulation is introduced to evaluate the capability of executing master production schedules in a shipyard as it simulates IHOP and master production schedule. The use of PPR-S model and object oriented DEVS as an integration mechanism for simulation is also discussed. DEVS shows production problems such as capacity shortages and throughput of each resource. Based on the stochastic DEVS model, the production capacity of each facility is evaluated. Copyright ? 2013 by the International Society of Offshore and Polar Engineers (ISOPE).-
dc.format.extent8-
dc.language영어-
dc.language.isoENG-
dc.titleInitial plan of shipbuilding capacity based on the stochastic discrete event simulation-
dc.typeArticle-
dc.identifier.scopusid2-s2.0-84883715110-
dc.identifier.bibliographicCitationProceedings of the International Offshore and Polar Engineering Conference, pp 713 - 720-
dc.citation.titleProceedings of the International Offshore and Polar Engineering Conference-
dc.citation.startPage713-
dc.citation.endPage720-
dc.type.docTypeConference Paper-
dc.description.isOpenAccessN-
dc.description.journalRegisteredClassscopus-
dc.subject.keywordPlusDEVS (discrete event system)-
dc.subject.keywordPlusMaster production schedule-
dc.subject.keywordPlusProduction capacity-
dc.subject.keywordPlusShip production-
dc.subject.keywordPlusWork breakdown structure-
dc.subject.keywordPlusDiscrete event simulation-
dc.subject.keywordPlusProcessing-
dc.subject.keywordPlusProduction control-
dc.subject.keywordPlusScheduling-
dc.subject.keywordPlusShipbuilding-
dc.subject.keywordPlusShips-
dc.subject.keywordPlusShipyards-
dc.subject.keywordPlusStochastic systems-
dc.subject.keywordPlusStochastic models-
dc.subject.keywordAuthorDEVS (discrete event system)-
dc.subject.keywordAuthorIHOP (integrated hull & outfitting plan)-
dc.subject.keywordAuthorMaster production schedule-
dc.subject.keywordAuthorPPR-S (product-
dc.subject.keywordAuthorProcess-
dc.subject.keywordAuthorProduction capacity-
dc.subject.keywordAuthorPWBS (product work breakdown structure)-
dc.subject.keywordAuthorResource-
dc.subject.keywordAuthorSchedule)-
dc.subject.keywordAuthorShip production-
Files in This Item
There are no files associated with this item.
Appears in
Collections
ETC > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Altmetrics

Total Views & Downloads

BROWSE