자켓 구조물 철거 시 절단을 고려한 Lifting 작업의 초기평가An Initial Evaluation of Lifting Operation for Jacket Removal with Cutting

Other Titles
An Initial Evaluation of Lifting Operation for Jacket Removal with Cutting
Authors
하윤진남보우
Issue Date
1-12월-2015
Publisher
선박해양플랜트연구소
Keywords
Crane capacity curve; Clearance; Removal; Lifting operation; Crane vessel
Citation
선박해양기술, v.1, no.56, pp 9 - 17
Pages
9
Journal Title
선박해양기술
Volume
1
Number
56
Start Page
9
End Page
17
URI
https://www.kriso.re.kr/sciwatch/handle/2021.sw.kriso/8175
ISSN
1225-987X
Abstract
In this study, the lifting operation during the removal of a jacket is evaluated at the initial design stage. In this study, we considered two typical jacket platforms with different sizes and weights. It is assumed that the jackets will be removed by the lifting operations using crane vessels. Firstly, according to the international guidelines, evaluation procedure for lifting operation at jacket removal stage is reviewed. Then, the lifting operations for the removal of thejackets are evaluated by applying two different crane vessels. Dynamic hook load(DHL) is calculated to check the crane capacity. The clearances between crane boom of the vessel/extremity of the crane vessel and the lifted jacket are also checked during the Lifting operation.
Files in This Item
There are no files associated with this item.
Appears in
Collections
ETC > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Altmetrics

Total Views & Downloads

BROWSE