Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

모노파일 해상풍력발전의 이송과 설치를 위한 일정계획 및 비용분석 시뮬레이션Scheduling and Cost Estimation Simulation for Transportation and Installation of the Offshore Monopile Wind Turbines

Other Titles
Scheduling and Cost Estimation Simulation for Transportation and Installation of the Offshore Monopile Wind Turbines
Authors
김보람손명조장왕석김태완홍기용
Issue Date
2015
Publisher
한국CDE학회
Keywords
Cost estimation simulation; Monopile foundation; Offshore wind turbine; Scheduling simulation; Transportation and installation (T&I)
Citation
한국CDE학회 논문집, v.20, no.2, pp 193 - 209
Pages
17
Journal Title
한국CDE학회 논문집
Volume
20
Number
2
Start Page
193
End Page
209
URI
https://www.kriso.re.kr/sciwatch/handle/2021.sw.kriso/7861
DOI
10.7315/CADCAM.2015.193
ISSN
2508-4003
2508-402X
Abstract
For reasons such as global warming, depletion of fossil fuels and the danger of nuclear energy the research and development of renewable energy is actively underway. Wind energy has advantages over another renewable energy in terms of location requirements, energy efficiency and reliability. Nowadays the research and development area is expanded to offshore because it can supply more wind reliability and free from noise pollution. In this study, the monopile offshore wind turbine transportation and installation (T&I) process are investigated. In addition, the schedule and cost for the process are estimated by discrete event simulation. For the simulation, simulation models for various means of T&I are developed. The optimum T&I execution plan with shortest duration and lowest cost can be found by using different mission start day and T&I means.
Files in This Item
There are no files associated with this item.
Appears in
Collections
ETC > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Altmetrics

Total Views & Downloads

BROWSE