모노파일 해상풍력발전의 이송과 설치를 위한 일정계획 및 비용분석 시뮬레이션
DC Field | Value | Language |
---|---|---|
dc.contributor.author | 김보람 | - |
dc.contributor.author | 손명조 | - |
dc.contributor.author | 장왕석 | - |
dc.contributor.author | 김태완 | - |
dc.contributor.author | 홍기용 | - |
dc.date.accessioned | 2023-12-22T07:30:56Z | - |
dc.date.available | 2023-12-22T07:30:56Z | - |
dc.date.issued | 2015 | - |
dc.identifier.issn | 2508-4003 | - |
dc.identifier.issn | 2508-402X | - |
dc.identifier.uri | https://www.kriso.re.kr/sciwatch/handle/2021.sw.kriso/7861 | - |
dc.description.abstract | For reasons such as global warming, depletion of fossil fuels and the danger of nuclear energy the research and development of renewable energy is actively underway. Wind energy has advantages over another renewable energy in terms of location requirements, energy efficiency and reliability. Nowadays the research and development area is expanded to offshore because it can supply more wind reliability and free from noise pollution. In this study, the monopile offshore wind turbine transportation and installation (T&I) process are investigated. In addition, the schedule and cost for the process are estimated by discrete event simulation. For the simulation, simulation models for various means of T&I are developed. The optimum T&I execution plan with shortest duration and lowest cost can be found by using different mission start day and T&I means. | - |
dc.format.extent | 17 | - |
dc.language | 영어 | - |
dc.language.iso | ENG | - |
dc.publisher | 한국CDE학회 | - |
dc.title | 모노파일 해상풍력발전의 이송과 설치를 위한 일정계획 및 비용분석 시뮬레이션 | - |
dc.title.alternative | Scheduling and Cost Estimation Simulation for Transportation and Installation of the Offshore Monopile Wind Turbines | - |
dc.type | Article | - |
dc.publisher.location | 대한민국 | - |
dc.identifier.doi | 10.7315/CADCAM.2015.193 | - |
dc.identifier.bibliographicCitation | 한국CDE학회 논문집, v.20, no.2, pp 193 - 209 | - |
dc.citation.title | 한국CDE학회 논문집 | - |
dc.citation.volume | 20 | - |
dc.citation.number | 2 | - |
dc.citation.startPage | 193 | - |
dc.citation.endPage | 209 | - |
dc.identifier.kciid | ART001991865 | - |
dc.description.isOpenAccess | N | - |
dc.description.journalRegisteredClass | kci | - |
dc.subject.keywordAuthor | Cost estimation simulation | - |
dc.subject.keywordAuthor | Monopile foundation | - |
dc.subject.keywordAuthor | Offshore wind turbine | - |
dc.subject.keywordAuthor | Scheduling simulation | - |
dc.subject.keywordAuthor | Transportation and installation (T&I) | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
(34103) 대전광역시 유성구 유성대로1312번길 32042-866-3114
COPYRIGHT 2021 BY KOREA RESEARCH INSTITUTE OF SHIPS & OCEAN ENGINEERING. ALL RIGHTS RESERVED.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.