대일정 생산 계획에 따른 조선소 생산 용량의 초기 평가를 위한 이산사건 시뮬레이션Discrete Event Simulation for the Initial Capacity Estimation of Shipyard Based on the Master Production Schedule
- Other Titles
- Discrete Event Simulation for the Initial Capacity Estimation of Shipyard Based on the Master Production Schedule
- Authors
- 김광식; 황호진; 이장현
- Issue Date
- 2012
- Publisher
- 한국CDE학회
- Keywords
- MPS (Master Production Schedule); Production Capacity; Stochastic Discrete Event Simulation
- Citation
- 한국CDE학회 논문집, v.17, no.2, pp 111 - 122
- Pages
- 12
- Journal Title
- 한국CDE학회 논문집
- Volume
- 17
- Number
- 2
- Start Page
- 111
- End Page
- 122
- URI
- https://www.kriso.re.kr/sciwatch/handle/2021.sw.kriso/1038
- ISSN
- 2508-4003
2508-402X
- Abstract
- Capacity planning plays an important role not only for master production plan but also for facility or layout design in shipbuilding. Product work breakdown structure, attributes of production resources, and production method or process data are associated in order to make the discrete event simulation model of shipyard layout plan. The production amount of each process and the process time is assumed to be stochastic. Based on the stochastic discrete event simulation model, the production capacity of each facility in shipyard is estimated. The stochastic model of product arrival time, process time and transferring time is introduced for each process. Also, the production capacity is estimated for the assumed master production schedule
- Files in This Item
- There are no files associated with this item.
- Appears in
Collections - ETC > 1. Journal Articles
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.