대일정 생산 계획에 따른 조선소 생산 용량의 초기 평가를 위한 이산사건 시뮬레이션
DC Field | Value | Language |
---|---|---|
dc.contributor.author | 김광식 | - |
dc.contributor.author | 황호진 | - |
dc.contributor.author | 이장현 | - |
dc.date.accessioned | 2021-08-03T05:42:51Z | - |
dc.date.available | 2021-08-03T05:42:51Z | - |
dc.date.issued | 2012 | - |
dc.identifier.issn | 2508-4003 | - |
dc.identifier.issn | 2508-402X | - |
dc.identifier.uri | https://www.kriso.re.kr/sciwatch/handle/2021.sw.kriso/1038 | - |
dc.description.abstract | Capacity planning plays an important role not only for master production plan but also for facility or layout design in shipbuilding. Product work breakdown structure, attributes of production resources, and production method or process data are associated in order to make the discrete event simulation model of shipyard layout plan. The production amount of each process and the process time is assumed to be stochastic. Based on the stochastic discrete event simulation model, the production capacity of each facility in shipyard is estimated. The stochastic model of product arrival time, process time and transferring time is introduced for each process. Also, the production capacity is estimated for the assumed master production schedule | - |
dc.format.extent | 12 | - |
dc.language | 한국어 | - |
dc.language.iso | KOR | - |
dc.publisher | 한국CDE학회 | - |
dc.title | 대일정 생산 계획에 따른 조선소 생산 용량의 초기 평가를 위한 이산사건 시뮬레이션 | - |
dc.title.alternative | Discrete Event Simulation for the Initial Capacity Estimation of Shipyard Based on the Master Production Schedule | - |
dc.type | Article | - |
dc.publisher.location | 대한민국 | - |
dc.identifier.bibliographicCitation | 한국CDE학회 논문집, v.17, no.2, pp 111 - 122 | - |
dc.citation.title | 한국CDE학회 논문집 | - |
dc.citation.volume | 17 | - |
dc.citation.number | 2 | - |
dc.citation.startPage | 111 | - |
dc.citation.endPage | 122 | - |
dc.identifier.kciid | ART001645435 | - |
dc.description.isOpenAccess | N | - |
dc.description.journalRegisteredClass | kci | - |
dc.subject.keywordAuthor | MPS (Master Production Schedule) | - |
dc.subject.keywordAuthor | Production Capacity | - |
dc.subject.keywordAuthor | Stochastic Discrete Event Simulation | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
(34103) 대전광역시 유성구 유성대로1312번길 32042-866-3114
COPYRIGHT 2021 BY KOREA RESEARCH INSTITUTE OF SHIPS & OCEAN ENGINEERING. ALL RIGHTS RESERVED.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.