Mating analysis for float-over installation of a large topside in various load transfer stages
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Jung, S.J. | - |
dc.contributor.author | Kwak, H.U. | - |
dc.contributor.author | Oh, S.H. | - |
dc.contributor.author | Kwon, Y.J. | - |
dc.contributor.author | Nam, B.W. | - |
dc.contributor.author | Kim, N.W. | - |
dc.contributor.author | Lee, K. | - |
dc.contributor.author | Sung, H.G. | - |
dc.date.accessioned | 2023-12-22T08:30:26Z | - |
dc.date.available | 2023-12-22T08:30:26Z | - |
dc.date.issued | 2018 | - |
dc.identifier.issn | 1098-6189 | - |
dc.identifier.uri | https://www.kriso.re.kr/sciwatch/handle/2021.sw.kriso/8443 | - |
dc.description.abstract | In this study, time-domain mating analyses were carried out to verify safety of float-over operation during various load transfer stages. Water depth of the target field is 130m. Topsides weighing 20,000 ton will be installed on fixed jacket structure by float-over using DTV (Deck Transportation Vessel) with the support of mooring lines. Five (5) operational stages from initial contact to 100% load transfer have been assessed by time domain analysis. For topsides mating analysis, DSUs, DSF Support Points, LMUs, steel-to-steel contacts at LMU points, sway fenders, mooring lines and many parts were modelled to investigate the interactions between the DTV, the topsides and the jacket. The results of analyses have been approved by a MWS. Copyright ? 2018 by the International Society of Offshore and Polar Engineers (ISOPE) | - |
dc.format.extent | 5 | - |
dc.language | 영어 | - |
dc.language.iso | ENG | - |
dc.publisher | International Society of Offshore and Polar Engineers | - |
dc.title | Mating analysis for float-over installation of a large topside in various load transfer stages | - |
dc.type | Article | - |
dc.identifier.scopusid | 2-s2.0-85053469087 | - |
dc.identifier.bibliographicCitation | Proceedings of the International Offshore and Polar Engineering Conference, v.2018-June, pp 944 - 948 | - |
dc.citation.title | Proceedings of the International Offshore and Polar Engineering Conference | - |
dc.citation.volume | 2018-June | - |
dc.citation.startPage | 944 | - |
dc.citation.endPage | 948 | - |
dc.type.docType | Conference Paper | - |
dc.description.isOpenAccess | N | - |
dc.description.journalRegisteredClass | scopus | - |
dc.subject.keywordPlus | Arctic engineering | - |
dc.subject.keywordPlus | Mooring | - |
dc.subject.keywordPlus | Mooring cables | - |
dc.subject.keywordPlus | Offshore oil well production | - |
dc.subject.keywordPlus | Float-over | - |
dc.subject.keywordPlus | Float-over installations | - |
dc.subject.keywordPlus | Initial contact | - |
dc.subject.keywordPlus | Jacket | - |
dc.subject.keywordPlus | Jacket structures | - |
dc.subject.keywordPlus | Mating analysis | - |
dc.subject.keywordPlus | Operational stages | - |
dc.subject.keywordPlus | Topside | - |
dc.subject.keywordPlus | Time domain analysis | - |
dc.subject.keywordAuthor | DTV | - |
dc.subject.keywordAuthor | Float-over | - |
dc.subject.keywordAuthor | Jacket | - |
dc.subject.keywordAuthor | Mating analysis | - |
dc.subject.keywordAuthor | Topside | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
(34103) 대전광역시 유성구 유성대로1312번길 32042-866-3114
COPYRIGHT 2021 BY KOREA RESEARCH INSTITUTE OF SHIPS & OCEAN ENGINEERING. ALL RIGHTS RESERVED.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.