Detailed Information

Cited 0 time in webofscience Cited 0 time in scopus
Metadata Downloads

Estimating Production Metric for Ship Assembly Based on Geometric and Production Information of Ship Block Model

Full metadata record
DC Field Value Language
dc.contributor.authorChoi, Won-Seok-
dc.contributor.authorKim, Dong-Ham-
dc.contributor.authorNam, Jong-Ho-
dc.contributor.authorKim, Min-Jun-
dc.contributor.authorSon, Young-Bin-
dc.date.accessioned2021-08-03T04:20:26Z-
dc.date.available2021-08-03T04:20:26Z-
dc.date.issued2021-01-
dc.identifier.issn2077-1312-
dc.identifier.issn2077-1312-
dc.identifier.urihttps://www.kriso.re.kr/sciwatch/handle/2021.sw.kriso/179-
dc.description.abstractTo secure technological competitiveness in shipbuilding and offshore industries, the continuous application and development of various technologies is essential. Efficient scheduling in shipyards is an important management task, whereby materials and manpower are allocated at the appropriate time and to the correct workspace. Although some large shipyards ensure effective scheduling and production management through simulations employing advanced technologies, most shipbuilding industries, including small- and medium-sized shipyards, continue to use an index based on past experiences. However, this legacy index, termed the basic unit, involves poor engineering logic; therefore, it does not appropriately reflect a shipyard's working environment, which changes rapidly in response to technological developments. Although this has led to a demand for improvements in the basic unit, a clear solution has not been presented thus far. In this study, a method for calculating the man-hours required for assembly, which is the basis for preparing the basic unit, is proposed. First, the assembly process is analyzed, and individual activities involved in the assembly process are quantified and formulated into working hours, which is defined as a production metric. Based on a ship's computerized block model, the geometric properties and production information required for calculating the metric are generated automatically as far as possible; this is to establish a convenient production metric calculation system. The proposed method features complete applicability in new shipyards through a customization. It also serves as a tool for predicting the metric of new ships or comparisons with those of existing ships.-
dc.format.extent19-
dc.language영어-
dc.language.isoENG-
dc.publisherMDPI-
dc.titleEstimating Production Metric for Ship Assembly Based on Geometric and Production Information of Ship Block Model-
dc.typeArticle-
dc.publisher.location스위스-
dc.identifier.doi10.3390/jmse9010039-
dc.identifier.scopusid2-s2.0-85099596602-
dc.identifier.wosid000610344200001-
dc.identifier.bibliographicCitationJOURNAL OF MARINE SCIENCE AND ENGINEERING, v.9, no.1, pp 1 - 19-
dc.citation.titleJOURNAL OF MARINE SCIENCE AND ENGINEERING-
dc.citation.volume9-
dc.citation.number1-
dc.citation.startPage1-
dc.citation.endPage19-
dc.type.docTypeArticle-
dc.description.isOpenAccessN-
dc.description.journalRegisteredClassscie-
dc.description.journalRegisteredClassscopus-
dc.relation.journalResearchAreaEngineering-
dc.relation.journalResearchAreaOceanography-
dc.relation.journalWebOfScienceCategoryEngineering, Marine-
dc.relation.journalWebOfScienceCategoryEngineering, Ocean-
dc.relation.journalWebOfScienceCategoryOceanography-
dc.subject.keywordAuthorproduction metric-
dc.subject.keywordAuthorman-hour estimation-
dc.subject.keywordAuthorCAD block model-
dc.subject.keywordAuthorshipbuilding assembly process-
Files in This Item
There are no files associated with this item.
Appears in
Collections
ETC > 1. Journal Articles

qrcode

Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.

Altmetrics

Total Views & Downloads

BROWSE