제약만족기법 기반의 최대부하감소를 통한탑재네크워크의 부하평준화
DC Field | Value | Language |
---|---|---|
dc.contributor.author | 류지성 | - |
dc.contributor.author | 김홍태 | - |
dc.contributor.author | 신종계 | - |
dc.contributor.author | 박진형 | - |
dc.contributor.author | 이병로 | - |
dc.date.accessioned | 2021-08-03T07:41:03Z | - |
dc.date.available | 2021-08-03T07:41:03Z | - |
dc.date.issued | 2004 | - |
dc.identifier.issn | 1225-1143 | - |
dc.identifier.uri | https://www.kriso.re.kr/sciwatch/handle/2021.sw.kriso/1760 | - |
dc.description.abstract | The logistics of entire shipbuilding process are integrated during the block erection process and the schedules for the erection process are made prior to the schedules of any other processes. Therefore, efficient scheduling of the block erection process are one of most important issues in shipbuilding. There are only a few studies published regarding block erection scheduling methods because of its complexity and variability. This paper proposes an algorithm for diminution of maximum load based on constraint satisfaction technique. it is developed primarily for the efficiency in load leveling and applicability to the actual block erection process. The proposed algorithm is applied to actual block erection process and the results shows improvements in load leveling. It can also be used for the scheduling of fabrication, sub-assembly, and assembly to improve load leveling. | - |
dc.format.extent | 8 | - |
dc.publisher | 대한조선학회 | - |
dc.title | 제약만족기법 기반의 최대부하감소를 통한탑재네크워크의 부하평준화 | - |
dc.title.alternative | Load Leveling of Block Erection Network Using Diminution of Maximum LoadBased on Constraint Satisfaction Technique | - |
dc.type | Article | - |
dc.publisher.location | 대한민국 | - |
dc.identifier.bibliographicCitation | 대한조선학회 논문집, v.41, no.5, pp 55 - 62 | - |
dc.citation.title | 대한조선학회 논문집 | - |
dc.citation.volume | 41 | - |
dc.citation.number | 5 | - |
dc.citation.startPage | 55 | - |
dc.citation.endPage | 62 | - |
dc.identifier.kciid | ART001087803 | - |
dc.description.isOpenAccess | N | - |
dc.description.journalRegisteredClass | kci | - |
dc.subject.keywordAuthor | Load Leveling(부하평준 | - |
dc.subject.keywordAuthor | 화) | - |
dc.subject.keywordAuthor | Diminution Method of Maximum Load(최대부하 감소기법) | - |
dc.subject.keywordAuthor | Erection Process(탑재공정) | - |
dc.subject.keywordAuthor | Block Erection Network(블록탑재 네트워크)Scheduling(일정계획) | - |
dc.subject.keywordAuthor | Constraint Satisfaction Technique(제약만족기법) | - |
Items in ScholarWorks are protected by copyright, with all rights reserved, unless otherwise indicated.
(34103) 대전광역시 유성구 유성대로1312번길 32042-866-3114
COPYRIGHT 2021 BY KOREA RESEARCH INSTITUTE OF SHIPS & OCEAN ENGINEERING. ALL RIGHTS RESERVED.
Certain data included herein are derived from the © Web of Science of Clarivate Analytics. All rights reserved.
You may not copy or re-distribute this material in whole or in part without the prior written consent of Clarivate Analytics.